In-Ground Installation. Bent-post systems require in-ground installation within a concrete base footing, a project usually undertaken by maintenance staff or professional installers. Typically, a 12" dia x 3-4' deep hole is dug, then filled with concrete; the post is placed into the wet concrete, which must then be allowed to cure for a week before the backboard and goal are attached.